Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2011 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 08/23/2011 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 05/05/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE AN OVERFLOW SENSOR IN SECONDARY DRAIN OUTLET ON FAN COIL 2) EXTEND CONDENSATE VENT ABOVE DRAIN PAN OVERFLOW 3) PROVIDE BUSHINGS WHERE SUCTION AND DISCHARGE LINES ENTER FAN COIL 4) DO NOT WIRE PUMP INTO LUGS IN DISCONNECT, ONLY 1 WIRE ALLOWED IN EACH LUG 5) CONDENSATE CANNOT TERMINATE INTO A SEWER VENT, TERMINATE TO WITHIN 6" OF THE GROUND AND SUPPORT EVERY 6' 6) REMOVE ALL DUCT TAPE USED OUTDOORS ON LINE SET AND PROVIDE A PROTECTIVE COATING ON EXPOSED ARMAFLEX OTHER THAN PAINT 7) SEAL DUCT CONNECTION TO FAN COIL |