Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2011 | ELECTRIC - FINAL | Approved | ||
| 05/13/2011 | ELECTRIC - FINAL | Partial Approval | VERIFY ELECTRODE GROUNDING SYSTEM NEED TO VERIFY PNLS A,B,C, BONDED TO ELECTRODE GROUNDING SYTEM OPEN NEUTRALS FROM PNL B NEED TO BE CORRECTED |