Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2011 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 03/17/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 03/10/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 12 LIGHT POLE BASE OK |
|
| 03/02/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 130 L.F. OF WEIR WALL FOOTING AS PER SHEET ?-8 DETAIL #12 2) SPECIAL INSPECTION BY STRUCTURAL CONCEPTS |
|
| 02/23/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) REINFORCEMENT STEEL AT TRASH ENCLOSURE FOOTING-OK |
|
| 02/11/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CONTINOUS FOOTINGS FOR MATERIAL STORAGE BINS PER SHEET S-8 DETAIL #1 2) STRUCTURAL CONCEPTS SPECIAL INSPECTION |
|
| 02/09/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) PIT FOR LOAD LEVELER AT WEST DOCK, PIPE STORAGE AREA #107 AND EAST SLAB AT GRID LINES C.1/TO B.2 AND 15/TO 16 OK |
|
| 02/03/2011 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* NOT READY DUE TO WEATHER |
|
| 12/30/2010 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) SPECIAL INSPECTION BY STRUCTURAL CONCEPTS D. NELSON AS PER SHEET S-1 2) REINFORCEMENT FOR CONCRETE FOOTING AT CONCRETE RAMP AND DOCK WALLS AT GRID LINES 11/D TO E, E/11 TO 9, 10.9/E TO B.3 OK |
|
| 12/14/2010 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 5 PIER FOOTINGS AT GRID LINE "D"/11,12,13,14 & 15 OK 2) SPECIAL INSPECTED BY STRUCTURAL CONCEPTS |
|
| 12/06/2010 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CMU WALL FOOTING SOUTH GRID LINE "A" FROM 11 TO 15 PLUS ENDS AND OUTSIDE WALL FOOTING FROM 11 TO 13.5 EXCEPT WEST END AT GRID LINE 11 OK |
|
| 12/01/2010 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) FOOTINGS AT LINE A/11 TO 15 W/F2 & F3 COLUMN FOOTINGS 2) FOOTINGS AT LINE 11/D TO A W/F3 & F8 COLUMN FOOTINGS 3) FOOTINGS AT LINE D/COLUMN FOOTINGS F-1, F-2, F-3, AND F-8 4) LINE 12.9 FROM D TO NORTH CMU WALL FOOTING F-6 WITH MASONRY VERTS AND MCJ'S |