Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2011 | FRAMING | Approved | IVRS - Inspection :* | |
| 01/21/2011 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) CALL FOR FRAMING AFTER STUCCO MESH IS APPLIED |
|
| 01/20/2011 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) CHECK FILL OF CONDUCTORS IN WALL BOX UP HIGH IN SOUTH WALL 2) ANCHOR BOLT WITHIN 12" IN SOLE PLATE SOUTH WALL 3) FILL ALL HOLES IN RAFTER HOLD DOWNS SOUTH WALL WITH NAILS 4) OK TO STUCCO, BEFORE FRAMING SIGNED OFF |
|
| 01/06/2011 | FRAMING | Not ready for Inspection | IVRS - Inspection :* |