Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2011 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/06/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) OK TO COVER WALLS S.T.O.I. |
|
| 05/05/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 05/04/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) PVC DOVV THROUGHOUT OK 2) COPPER WATER TEST OK OK TO INSTALL |
|
| 05/03/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ALL PIPING IS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION, AND AT THE END OF BRANCHES. 2) ALL VERTICAL PIPING TO BE SUPPORTED 3) CAP OFF ALL OPEN SEWER PIPES 4) MUST BE 6" ABOVE FLOOD RIM BEFORE REVENTING 5) OK TO START INSULATING HOT PIPING |