Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/09/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE APPROVED FLASHING AND INSTALL OF FLASHING |
|
| 11/17/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEE NOTE #5 AND PROVIDE FLASHING THAT IS USED FOR THIS STYLE ROOF TILE AND PIPE PENETRATIONS PROPERLY INSTALLED WITH FITTING CORRECTLY TOGETHER |
|
| 11/05/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A SEDIMENT TRAP AT GAS ENTRY TO WATER HEATER 2) PROVIDE GFCI PROTECTION FOR NEW ELECTRICAL OUTLET 3) T & P DRAIN TO BE RIDGID PIPING (NO FLEXES) (3-5) SEAL PIPE TERMINATION THRU TO EXTERIOR 4) TUBING TO BE SUPPORTED AT 32" INCREMENTS PER INSTALLATION STANDARDS THRU OUT ENTIRE SYSTEM 5) PROVIDE APPROVED ROOF FLAHINGS FOR PIPE PENETRATIONS THRU ROOF 6) PROVIDE ACCESS TO ATTIC SPACE FOR TUBING INSPECTION |