Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/19/2010 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) PROVIDE P-TRAP AT CONDENSATE DRAIN 2) PROVIDE SECONDARY DRAIN AT CONDENSATE 3) ALL PVC JOINTS ARE TO BE PRIMERED, PRIMER IS TO BE PURPLE IN COLOR 4) T & P NOT TO BE PIPED UPWARD, PENETRATE FLOOR WITH PIPING. DO NOT USE FLEXIBLE CONNECTIONS |