Permit: T10CM02836

Parcel: 12901018M


Addresses:

191 S PLUMER AV


Inspection Status: Not ready for Inspection

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T10CM02836

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Not ready for Inspection

Date Description Inspector Results Comments
11/08/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) THERE MAY BE NO FOULING LEDGE IN THE CLOSET BEND
11/07/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) CLOSET FLANGE IS TO EXTEND 1/4" ABOVE FINISHED FLOOR -EXPOSE ALL FLANGES
11/04/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 100 PSI ON BLACK STEEL AIR PIPING, NO PLANS SPECS PROVIDED
2) INSTALL QD FOR DETAIL
11/04/2011 PLUMBING - INTERMEDIATE Approved
07/08/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) DWV CORRECTIONS OK
2) LAV CARRIERS SPECIFIED
3) CLOSET FLANGES NOT SECURED TO F.F.
07/07/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) TRAP WEIR MAY NOT BE BELOW THE POINT OF VENT REPIPE DBL SINK
07/01/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) TRAP AND TRAP ARM TO BE THE SAME SIZE TRAP MAY BE ONLY ONE SIZE LARGER THEN CONNECTING TAIL PIECE-TRAP ARM MAY NOT CHANGE SIZE. TRAP ARM TO CONNECT THRU SANTEE
2) VENT FITTINGS LESS THAN 6" ABOVE FLOOD RIM TO BE DRAINAGE TYPE
3) VENT CONNECTS DOWN STREAM OF TRAP
4) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE SWEEP
06/16/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) PLUMBER NOT ON SITE
2) CONTINUED NOT READYS WILL RESULT IN A REINSPECTION FEE
06/13/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) DELTA 2 REVISION DELETES GREASE TRAP
2) PLUMBING IS STILL NOT INSTALLED PER PLAN
3) HAVE PLUMBER ON SITE AT TIME OF NEXT INSPECTION
4) AS CORRECTIONS ARE TO NUMEROUS AND COMPLICATED TO LIST
5) CLEANOUTS TO OPEN IN THE DIRECTION OF FLOW
6) SEWER ON NORTH SIDE OK TO COVER