Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/01/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) IMPROPER CONNECTION TO MOP SINK FAUCET, ABOVE MAY NOT HAVE VALVES DOWN STREAM 2) FO SYSTEM LEAKING, PROVIDE RIGID PIPING AT DRAIN TERMINATIONS 3) SUPPORT BACKFLOW ASSEMBLIES 4) LETTERS RECEIVED FOR CHANGES PER ERIC |
|
| 07/28/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE STERILIZATION DOCUMENTED PROCEDURES AND TEST REPORT 2) PROVIDE RP CERT FOR IRR ASSEMBLY 3) SVB REQUIRES CERT BUT IT ALSO MAY NOT BE INSTALLED MORE THAN 5' ABOVE PLATFORM 4) BACKFLOW ASSEMBLIES REQUIRE UNIONS FOR SERVICING 5) COMPLETE RO SYSTEM, TRAP PRIMERS WITH AIR CAP FIITINGS SPECIFIED, ECO LAB INSTALLATION AND DOME STRAINERS |