| 02/12/2015 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 01/20/2012 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) UNITS #30-#35 CLOSET FLANGES OK |
|
| 12/29/2011 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 12/05/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) SEE NOTES FROM 09/08/11 |
|
| 09/08/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) HAVE ALL CLOSET FLANGES READY FOR INSPECTION 2) CLOSET FLANGES AND TO EXTEND 1/4" ABOVE FINISHED FLOOR 3) FLANGES ARE TO9 BE SECURED 4) 2ND FLOOR FLANGES TO BE SECURED WITH S.S. OR BRASS SCREWS |
|
| 09/07/2011 | PLUMBING - INTERMEDIATE | Cancelled | IVRS - RI canceled | |
| 09/07/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) CONDENSATE PIPING IS INSPECTED BY MECHANICAL INTERCEPTOR 2) CALL IN ITEM 04035 |
|
| 08/10/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) NEED TO SEE CLOSET FLANGES 2) WALLS OK 3) CONDENSATE UNIT #1 OK-CALL 04035 (MECH) FOR CONDENSATE |
|
| 06/16/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) WHILE BUNDLING OF PEX IS PERMITTED, ISOLATE HOT FROM COLD TO HELP PRVENT HEAT TRANSFER 2) CPVC T & P RELIEF DRAINS 6"-24 AFF 3) TUBS OK |
|
| 05/26/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE APPROVED COUPLINGS ON TUB DRAINAGE AND PROVIDE TEST ON NEW TUBS 2) PEX TO BE INSTALLED WITH CORRECT RADIUS ON TUBING OR PROVIDE FITTINGS FOR CHANGE OF DIRECTION 3) PROVIDE 18" IN WALL COPPER PER NOTED 1/26/11 INSPECTION 4) PROVIDE TEST ON ALL WATER PIPING 5) SEAL TUB BOXES ON EXISTING TUBS |
|
| 05/24/2011 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE ACCESS TO SITE, HAVE YOUR PLUMBER ON SITE FOR NEXT INSPECTION |
|
| 01/26/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE 18" OF COOPER BEFORE TIEING INTO PEX AT WATER HEATER PER 2006 UPC 604.11.2 |
|
| 10/15/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* COVER ALL OPEN ABS PIPING IN UNITS AND CLOSET FL?/? UNITS #48 + #49 + #33 IN WALL WATER PIPING OK |
|
| 10/14/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 10/13/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) WALK THRU WITH PLUMBING |