Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/04/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/25/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) 1 1/2" MINIMUM CLEARANCE BETWEEN ROOF AND PIPING REQUIRED 2) 6" MINIMUM CLEARANCE REQUIRED FOR T & P TERMINATIONS ABOVE GRADE 3) MAKE TEMPERING VALVE ACCESSIBLE 4) A WATER HEATER SUPPORTED FROM THE GROUND SHALL REST ON LEVEL CONCRETE OR OTHER APPROVED BASE EXTENDING NOT LESS THAN 3" ABOVE GRADE UPC 508.3 (SMALL PAVERS ARE NOT ACCEPTABLE) 5) ELECTRICAL CONNECTIONS REQUIRE AN ELECTRICAL INSPECTION |