Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 10/07/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) RECEIVED PETTION OF APPEAL 2) PROVIDE SEDIMENT TRAP AT GS ENTRY TO HEATER 3) PROVIDE MINIMUM 6" CLEARANCE FROM SINGLE WALL VENT AND COMBUSTIBLE INSULATION 4) REPAIR LEAK AND PROVIDE CITY APPROVED PIPING DIAGRAM WITH CORRECT INSTALLATION 5) NOTE: PROVIDE OG LISTING FOR SOLAR PANEL IT IS NOT VISIBLE ON PANL 6) PROVIDE APPROVED VENT THRU ROOF (DBL WALL) TERMINATING MINIMUM DISTANCE ABOVE ROOF WITH APPROVED VENT CAP PROPERLY FLASHED TO PREVENT WEATHER ENTRY 7) T & P DRAIN TO TERMINATE 1" ABOVE TOP LIP OF DRIP PAN |
|
| 09/29/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER FABIAN (CONTRACTOR) |