Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 11/09/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MAIN BREAKER TO BE REPLACED TO 175A PER PLANS SOAS NOT TO EXCEED 120 PERCENT ABOVE RATING OF BUSS 2) NEUTRAL CONDUCTOR TO BE PROPERLY INDENTIFIED. CANNOT USE NEUTRAL TO BOND EQUIPMENT AND RACEWAYS 3) INSTALL EQUIPMENT GROUND PER PLANS 4) #8 GEC TO BE INSTALLED IN RACEWAY OR CABLE ARMOR TO BE PROTECTED FROM DAMAGE 5) CONNECT EQUIPMENT GROUND TO PANELS ONN ROOF NOT JUST TO RACK |