Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2011 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection :* | |
| 03/23/2011 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* | |
| 03/17/2011 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* | |
| 02/28/2011 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EXTERIOR DEVICES AND LIGHTS 8' AND BELOW TO BE INSTALLED OR BLANK PLATED 2) MARKING TAPE TO ENCIRCLE CONDUCTOR 3) GROUNDING ELECTRODE CONDUCTOR TO TERMINATE TO MARKED TERMINAL IN CT CAN 4) PARALLEL CONDUCTORS TO BE SAME LENGTH (NEUTRAL) 5) BREAKER LOCK OUT BROKEN 6) NEED BUSHINGS 352.46 & 300.4 |