Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - PROGRESS
Permit Number - T10CM02468
Inspection Description - ELECTRIC - PROGRESS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/29/2010 | ELECTRIC - PROGRESS | Approved | PER EL FINAL | |
11/16/2010 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SUPPORT WIRES NEED TO BE TIEDF OFF AT BOTH ENDS PER 300.11 NEC 2) 2 X 4 LAY IN FIXTURES NEED TO BE SECURED TO GRID 410.16 NEC., ALSO WIRES TIED OFF AT ADJACENT CORNERS OF FIXTURES NEED TO THREAD THRU HOLES PROVIDED BY FIXTURE, DO NOT USE BEND OUT TABS FOR WIRE SUPPORTS 3) THERM, LV, CABLING NEEDS TO BE SUPPORTED TO BLDG STRUCTURE, OFF GRID 725-800 NEC |
|
10/29/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* |