Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 12/15/2010 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) RELOCATED FLOOR SINK IN BAKERY WITH VENT PER RED LINE ON SITE FOR 2" INSTEAD OF 3" WITH 2" VENT TO 42" AT HAND SINK. NEED TO SEE TIE IN |
|
| 12/07/2010 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) RELOCATED FS AT PRODUCE IS OK 2) 2 FS AT BAKERY TO ABOVE CEILING OK 3) INSTALL WRAPS PRIOR TO CONCRETE 4) USE CARE TO KEEP ALL DRAIN AND VENT PIPING CAPPED IN THIS OPEN STORE, IMMEDIATELY CAP ALL DRAIN IN TR'S 5) ONLY REFEE WARNING |