Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) ALSO RELIEVE THE STRAIN ON TUBING CONNECTIONS 2) REMOVE PIPE INSULATION WITHIN 6" OF VENT CONNECTOR |
|
| 09/28/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) THE LOCATION OF THE CHECK VALVE HAS CREATED A CLOSED SYSTEM AND AN EXPANSION TANK IS REQUIRED 2) SECURE THE SOLAR TUBING AT THE STORAGE TANK AREA 3) MAKE WEATHER ENCLOSURE WEATHER RESISTANT AND SEAL PIPING PENETRATIONS |