Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 12/03/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) LEAK AT HEAT EXCHANGER 2) SEAL ALL JOINTS IN PIPEN INSULATION WITH ADHESIVE SPECIFIED BY THE MANUFACTURE 3) CORRECT PIPE SUPPORT CLAMPS; THEY DO NOT SECURE THE PIPING. A HARD SECTION IS REQUIRED CORRECT ALL SCHINNERS |
|
| 11/18/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |