Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2010 | ELECTRIC - FINAL | Approved | ||
| 11/05/2010 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) NEED 100 A CKT MAIN BREAKER PANEL 'H' |
|
| 11/04/2010 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) FUSES AT 480V DISC. AND AT SES NEED TO BE 150A |
|
| 11/03/2010 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) PLANS CALL FOR 150A MAIN PANEL H 2) CONTRACTOR TO OPEN EQUIPMENT CONTACTOR J-BOX FOR INSPECTION 3) WHEN USING METAL RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR (X-FORMER) INSTALL BOND BUSHING BOTH ENDS PER NEC 250 |