Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 09/16/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1. PROVIDE LOAD CALC FOR NEW UNIT ON ROOF 2. CONDESATE NOT PROPERLY TERMINATED |
|
| 09/14/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSULATE ALL EXPOSED SHEET METAL DUCT IN FURNACE ROOM 2) 3/8" I.D. X 24" GAS FLEX NOT ADEQUATE FOR 100,000 BTU 2) RECEPT ON ROOF MUST BE GFI PROTECTED 3) PROVIDE ROOF JACKS AT ROOF PENETRATIONS AT ELECTRIC CONDUITS. SUPPORT ELECTRIC CONDUIT 4) PROVIDE THE REQUIRED ROOF TOP DRAWING FOR NEW A/C ON ROOF |