Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2011 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 07/15/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) SEALED JOINTS ON DUCTING OK 2) 2ND LAYER OF FIRE WRAP IS OK 3) LETTER FROM ENGINEER OK |
|
| 05/31/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 05/18/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) OK TO COVER DUCT IN NORTH SIDE SOFFITS PENDING APPROVAL FROM MECH. ENGINEER TO USE DOVE TAILS |
|
| 05/17/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) PROVIDE 45 DEGREE BRANCH TAPS AS PER PLANS 2) PROVIDE SPIN IN COLLOARS AS PER PLANS 3) INSULATE LINEAR CANS TO MINIMUM 4.2 AS PER PLANS AND CODE REQUIREMENTS 4) FLEX DUCT SUPPORT NOT TO EXCEED 5' 5) ANY CHANGES TO PLANS, SPECS, DETAILS REQUIRE WRITTEN APPROVAL FRO MECH. ENGINEER OF RECORD |