Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 12/14/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MIN BURRIAL DEPTH FOR PVC TO BE 18" NEC 300.5 2) EQUIPMENT GROUND TO CONNECT TO PV PANELS TO BE INSTALLED IN SAME RACEWAY AND CABLE 3) PLAN ONLY CALL FOR 16 PANELS 24 INSTALLED 4) INSTALL EQUIPMENT GROUND PER PLANS 5) INSTALL LABELING PER NEC 690 6) INSTALL LABEL AT SERVICE PANEL PER NOTE #11 LAST INSPECTION 7) INSTALL NEUTRAL CONDUCTOR PER PLANS 8) REVISE PLANS TO REFLECT INSTALLATION AS IT IS |
|
| 11/30/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EXPOSE ALL NEW UNDERGROUND RACEWAYS. NEED TO MEET MINIMUM BURIAL REQUIREMENTS OF NEC 300.5 2) PVC ABOVE GRADE TO BE SCHEDULE 80 3) BOXES TO BE SECURED 4) NEED GROUNDING ELECTRODE SYSTEM CONNECTING TO INVERTER 5) LUGS LISTED FOR 1 WIRE TERMINATION 6) ALL CONDUCTOR OF BRANCH CIRCUIT TO BE INSTALLED TOGETHER IN SAME RACEWAY 7) CANNOT USE PANEL BOARD AS PASS THRU FOR BRANCH CIRCUIT TO PV SYSTEM 8) ARE MOTORS TO BE WIRED ? 9) WIRING TO PANELS NOT COMPLETE 10) NEED WORKING LABELS PER NEC 690 11) NEED LABEL AT PANEL PROVIDING LOCATION OF GENERATING SOURCES ON PROPERTY 12) CLOSE LB COVERS 13) STOPPED INSPECTION, TO MANY ITEMS TO LIST. INSTALL PER PLANS AND NEC. OBTAIN SERVICES OF QUALIFIED ELECTRICAL CONTRACTOR |