Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T10CM02181
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 11/02/2010 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEE NOTES #3 & 4 AND COMPLY |
|
| 08/16/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE FULL PORT COLD WATER SHUT OFF VALVE TO SERVICE WATER HEATER ON COLD INLET 2) PROVIDE APPROVED NIPPLES ON COLD INLET AND HOT OUTLET (NO BLACK IRON PIPING) 3) PROVIDE APPROVED DRAIN PIPE TERMINATING 6" ABOVE FINISH GRADE FOR TEMPERATURE AND PRESSURE RELIEF VALVE 4) PROVIDE CORRECT WIRE INDENTIFICATION FOR CIRCUIT |