Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T10CM02158

Parcel: 121122950

Inspection Status: Approved

Inspection History: MECHANICAL - FINAL

Date Description Inspector Results Comments
09/27/2010 MECHANICAL - FINAL Approved IVRS - Inspection :*
1) CORRECTIONS HAVE BEEN MADE
09/09/2010 MECHANICAL - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) WATER HEATER VENT CONNECTOR HAS BEEN ALTERED. REMOVE ALL FOIL TAPE FROM VENT CONNECTOR AND PROVIDE MINIMUM 3 SCREWS IN ALL JOINTS. NO TAPE
2) PROVIDE THE REQUIRED DRAWING FOR NEW A/C ON THE ROOF
3) ID CIRCUIT BREAKERS
4) SUPPORT PVC ON ROOF EVERY 4'. USE PURPLE PRIMER ON ALL FITTINGS PRIOR TO GLUE. PAINT EXPOSED PVC WITH LATEX PAINT. TERMINATE CONDENSATE WITH AN ELBOW AND A NIPPLE. PROVIDE MINIMUM 1/8" PER FT. SLOPE
5) SECURE THE A/C UNIT AND ANGLE IRON STAND TO THE STRUCTURE
6) PROVIDE MINIMUM 2" R8 DUCT LINER IN EXPOSED DUCT
7) PROVIDE ACCESS INTO ATTIC. ALL NEW DUCTING IN ATTIC MUST HAVE MINIMUM R8 INSULATION