Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2011 | FIRE SPKLR - FINAL | Approved | ||
| 08/29/2011 | FIRE SPKLR - FINAL | Denied | 1. Tire changing area pipe next to sprinkler head and tape on it. 2. Install sprinkler heads in the tire carousel. 3. Sales floor 2 heads blocked by trusses. |
|
| 08/23/2011 | FIRE SPKLR - FINAL | Denied | 1. Cal plates needs to be etched lettering not black maker writing. 2. Tape on heads in the following areas: Sales floor northwest corner Sales floor next to duct work by lounge area Sales floor 2 heads 1st exit door north east side Service floor 2 heads (tire changing area and southeast corner under cooler) Taped heads in car wash area 3. Add sprinkler head in closet in bathroom (owners) 4. Correct sprinkler coverage in room 122 file room. Heads 8 feet off two walls. 5. Paint 2" sprinkler piping outside above canopy southeast side. 6. In parts area 2nd floor goose neck nipples to close to riser replace with 4" nipples. 7. In parts are with goose neck check sprinkler piping one line has sprinklers at 15' 3" apart. 8. In parts area get insulation off of sprinkler heads by 1" throughout. 9. Add sprinkler cages to heads under stairs in warehouse area. 10. All sprinkler heads under open gratings in warehouse shall be shielded from the discharge of overhead sprinklers. NFPA 13 8.5.5.3.3 11. Install in rack sprinklers in the tire carousel per approved plans. |