Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/26/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) BACKFLOW PROTECTION REQUIRED FOR CAR WASH 2) MAKE UP WATER (RPA) 3) ALL OTHER CORRECTIONS OK |
|
| 08/25/2011 | PLUMBING - FINAL | Not ready for Inspection | LABEL NON POTABLE HOSE ROOF WATER SUPPLY PIPING SUBMIT AN AS-BUILT DRAWING CORRECT LEAK AT ROOF DRAIN CONNECTION LOCATE COVER CO AT COFFEE SINK TRIM EXTERIOR CLEAN OUTS REMOVE MUD AT EXTERIOR VALVE BOXES PROVIDE STERILIZATION REPORTS |
|
| 08/19/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NOT READY FOR FINAL; - ALL AREAS HAVE NOT YET BEEN INSPECTED - REVIEW INSP. HISTORY AND JOB PLANS - DETERMINE WHICH PIPING SYSTEMS HAVE NOT BEEN INSPECTED. - PREPARE THESE AREAS FOR INSPECTION AND SCHEDULE INSPECTIONS...ROOF DRAINS, OVERHEAD DOMESTIC WATER CW DIST, INTERNAL BACKFLOW PROTECTION, ABV CEILING DWV SUPPORTS, YARD WATER TO HOSE BIBS, ETC. |