Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 04/05/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* SAMPLING TANK WTEST OK AREA DRAIN & RWL SW STAIRWELL OK |
|
| 03/14/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | 1. FOUR INCH SANITARY TIE INTO BRANCH FOM DETAIL SHOP BACK UPSTREAM THROUGH (2) SO-2 PAGE P-2.2 WITH TIE-IN FROM GREASE WASTE PIPING ALREADY COVERED WITH VENTS WATER TEST INCLUDING INTERCEPTORS OK PROVIDE SAMPLING BOX PER PLAN WITH TEST. | |
| 03/01/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | 1. TR 159 WITH UTILITY SINK 157 | |
| 02/28/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/25/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) GW TO INTERCEPTORS 2) NEED TO SEE CONNECTIONS TO TDS AND INTERCEPTORS |
|
| 02/24/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) SOIL PIPE WITH TEST THRU CLEANOUT FITTINGS, WEST OF MATCH LINE WITH TIE IN TO SEWER OK |
|
| 02/10/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | GANG TOILET ROOMS 120 AND 121 AND MAINS, EXCEPT TOILET ROOM 107. | |
| 02/02/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | tr and sinks on west side to col 2ao | |
| 02/01/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*4" ABS TIE IN AT 4" ABS SEWER OK | |
| 01/28/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 01/27/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) SITE SEWER OK, NEED TO SEE TIE IN TO EXISTING AND TIE IN AT BLDG CONNECTIONS |
|
| 01/26/2011 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL A 3" CLEANOUT ON URINAL BRANCH 707.11 2) PROVIDE UNIFORM SLOPE THROUGHOUT 3) SITE SEWER HAS BACK PITCH IN AT LEAST 3 LOCATIONS, ALSO I WILL NEED TO INSPECT CONNECTION TO EXISTING SEWER |
|
| 01/25/2011 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*POST YOUR ADDRESS, 3" C/O REQUIRED FOR 3" WASTE PIPING, HORZONTAL VENTING ALLOWED FOR STRUCTURAL CONDITIONS, SUPPORT PIPING WITH CLEAN FILL, WASTE PIPING LIMITED TO 135 DEGREE, |