Inspection History Details
Inspection Status: Partial Approval
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* | |
| 07/30/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE PLUMBING PERMIT WITH ISOMETRIC DRAWING FOR GAS PIPING AND PROVIDE LOAD CALC ON UNIT 2) PROVIDE PLUMBING GAS PRESSURE TEST 3) PROVIDE APPROVED PIPING FOR BURIAL AT GAS LINE 4) PROVIDE PERMIT FOR WATER HEATER INSTALLATION 5) MECHANICAL CONTRACTOR TO BE ON SITE TO VERIFY REQUIRED DUCT LINER AT NEXT INSPECTION 6) W/H FLUE PIPE NOT PROPERLY INSTALLED 7) T & P NOT PIPED PROPERLY 8) REMOVE GAS PACK COCK AND CAP GAS PIPING TO OLD FURNACE |