Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 08/30/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE READ MATERIAL TYPES ACCEPTABLE FOR VENT INTAKE EXHAUST AND PROVIDE FROM PAGE 19 OF INSTALLATION MANUAL 2) PROVIDE PRESSURE RELIEF DISCHARGE PIPE DWON FROM VALVE ON ROOF 3) INSULATION EXPSOED TO SUNLIGHT TO BE PROTECTED FROM UV RAYS PER MANUFACTURE INSTALLATION REQUIREMENTS 4) SEE NOTE #6 ABOVE AND COMPLY WITH AIR BREAK REQUIREMENT 5) HAVE GAS FLEX RATED FOR 145,000 AND APPROVED GAS SHUT OFF VALVE ON |
|
| 08/27/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NO ACCESS AT 10: 12 AM. PLEASE LEAVE A CONTACT PHONE NUMBER WITH MESSAGE IF YOU NEED TO BE CONTACTED 30 MINUTES PRIOR TO INSPECTION |
|
| 08/11/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE CORRECT FLASHING FOR GAS PIPING PENETRATING ROOF 2) PLEASE HAVE ETERNAL WATER HEATER INSTALLATION INSTRUCTIONS ON SITE, INSTALL PER REQUIRED CLEARANCES FOR MAINTENANCE AND INSTALL CORRECT VENTING 3) IF YOU TIE (2) 3/4" TEMPERATURE OR PRESSURE RELIEF DEVICES TOGETHER THE DRAIN PIPING IS REQUIRED TO BE 1 1/4" AND NO FLEX PIPING IS ALLOWED 4) SOLAR LOOP TUBING TO BE MINIMUM 1 1/2" ABOVE ROOF SURFACE SUPPORTED AT 32" INCREMENTS WI9TH WEATHER RESISTANT SUPPORTS AND SUPPORT TO BE MASTIC TO ROOF PIPING TO BE SECURED TO SUPPORTS. SECURE TUBING IN CLOSET AT CORRECT INTERVALS 5) GAS PIPING TO BE PROPERLY SUPPORTED 6) PROVIDE APPROVED DRAINAGE PIPING FOR CONDENSATE DRAIN TO LAUNDRY BOX WITH AIR BREAK |