Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/15/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CONTINUED NOT READYS WILL RESULT IN A REINSPECTION FEE |
|
| 11/10/2011 | PLUMBING - FINAL | Not ready for Inspection | 1) ALL EQUIPMENT TO BE CONNECTED, DRAINS, WATER SERVICE, ETC........ 2) I.W. PIPING MUST HAVE A MINIMUM 1" AIR GAP 3) IN PIPING TO BE APPROVED MATERIAL TYPE 4) IN PIPING TO BE SUPPORTED IN APPROVED MANNER 5) IN PIPING OVER FIVE FEET IN LENGTH TO BE DIRECTLY TRAPPED METHOD OF STERILIZATION 6) ALL HOT AND RECIRC. PIPING TO BE INSULATED 7) VACUUM RELIEF |
|
| 11/02/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |