Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2011 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 04/19/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 04/01/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) OK TO COVER ROUGH & INTERMEDIATE PLUMBING FOR WASHER AND P-4 ONLY |
|
| 03/28/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 3/4" HOT AND COLD TO WATER HEATER AREA OK 2) UNDERGROUND DRAINAGE FOR WASHER AND P-4 SINK 3) DWV TEST THRU ROOF OK 4) PROVIDE APPROVED SUPPORT FOR VENT THRU ROOF AT OFF SET 5) PROVIDE PIPE PROTECTION PLATES FOR INWALL COPPER WITHIN 1 1/2" OF STUD FACE. AT WASHER AND P-4 SINK AREA 6) PLAN SPECS INTERCEPTOR WITH INTEGRAL FLOW CONTROL INSTALL PER APPROVED PLAN ON YOUR 3 COMP SINK. VENT IS INCORRECT INTERCEPTOR, NEEDS TO BE 2" FOR 2" OUTLET PIPING. WHERE IS FLOOR SINK ? 7) PLEASE LEAVE A CONTACT PHONE NUMBER SO THAT YOUR PLUMBER CAN BE ON SITE FOR NEXT INSPECTION |