Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 08/20/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE APPROVED PAD FOR SOLAR STORAGE TANK ON FIRM GROUND WITH WEATHER PROOF ENCLOSURE FOR TANK AND PUMP ASSEMBLY 2) INSTALL PER PETITION OF APPEAL FOR ALTERNATE FORM OF TEMPERATURE AND PRESSURE RELIEF AND HAVE FORM FILLED OUT AND SIGNED BY OWNER ON SITE 3) PROVIDE 1" MINIMUM CLEARANCE FROM COMBUSTIBLES AT ROOF LEVEL FRO DBL WALL VENT PIPING 4) REMOVE TAPE AT SINGLE TO DBL WALL VERNT CONNECTION 5) PROVIDE UPPER COMBUSTION AIR OPENING FOR GAS WATER HEATER FOR 40,000 BTU DEVICE AWAY FROM RETURN AIR GRILL FOR A/C UNIT 6) POTABLE WATER PIPING EXPOSED TO FREEZING TO BE PROPERLY INSULATED AND INSULLATION PROTECTED FROM SUN EXPOSURE 7) SOLAR LOOP PIPING TO BE PROPERLY SUPPORTED AND J-HOOK HOLES PROPERLY SEALED WITH ROOFING MATERIALS 8) ROOF TOP SUPPORTS TO BE MASTIC TO ROOF SURFACE TO PREVENT MOVEMENT |