Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 08/16/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) REMOVE THE TAPE AT THE SINGLE TO DBL WALL VENT CONNECTION TO PROVIDE AIR IN DRAFT SPACE OF WATER HEATER VENT 2) GRAVITY DRAIN THE STORAGE TANK PRESSURE RELIEF DRAIN TO DAYLIGHT 90 DEGREE DOWN TERMINATION 3) SEAL ALL JOINTS ON INSULATION ON ROOF. PETITION OF APPEAL FOR WATER HEATER TURNED IN 4) PROVIDE A DEDICATED CIRCUIT OR GFI PROTECTION FOR PUMP CIRCUIT IN GARAGE |