Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2011 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 04/21/2011 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* ENERGY CERTIFICATION NEEDED AT ELECTRICAL PANEL DOUBLE STAMP FROM ENGINEER FOR POST TENTION SLAB- MINIMUM 30" CLEARANCE NEEDED IN ATTIC TO AIR HANDLER LABEL AT HOSE BIB FOR POST TENTION SLAB |