Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) CONTRATOR PROVIDED PCDEQ AUTHORIZATION TO DISCHARGE. DWV WATER TEST THRU ROOF |
|
| 03/07/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | PROVIDE PROOF OF INSPECTION OF 6" SITE SEWER FOR REVISION 3 PAGE P.2, PROVIDE TEST FREE OF LEAKS AND NO WATER OR WET SOIL IN DITCHES, VENT FITTINGS BELOW FLOOD RIM OF FIXTURES TO BELONG RADIUS OR EQUAL. PROVIDE FULL SIZE 4" C/O FOR RESTROOM BRANCH. | |
| 03/04/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | CANCELLED | |
| 02/03/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* NOT READY PER CONTRACTOR |