Date Description Inspector Results Comments
10/27/2011 MECHANICAL - INTERMEDIATE Approved
10/25/2011 MECHANICAL - INTERMEDIATE Partial Approval
10/24/2011 MECHANICAL - INTERMEDIATE Partial Approval
10/06/2011 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
PROVIDE STIFFENERS IN DUCT (BASEMNET, PARKING AREA) PER SMACNA STANDARDS OR AS NEEDED
10/03/2011 MECHANICAL - INTERMEDIATE Partial Approval
08/26/2011 MECHANICAL - INTERMEDIATE Partial Approval
08/17/2011 MECHANICAL - INTERMEDIATE Partial Approval
08/10/2011 MECHANICAL - INTERMEDIATE Partial Approval AH2.2 & AH3.2 CONNECTION TO CHILLED WATER (110 PSI TEST) OK

HYDRONIC PIPING IN MECH 3 OK (110psi TEST)
08/04/2011 MECHANICAL - INTERMEDIATE Partial Approval
07/29/2011 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) HYDRO TEST AT 2ND FLOOR F.C.-2.5 3RD FLOOR F.C.-3.3, F.C.-3.5 100 PSI OK
2) SUPPLY AIR DUCT IN WEST STAIRWELL FROM 9TH FLOOR TO 1ST FLOOR OK
07/13/2011 MECHANICAL - INTERMEDIATE Partial Approval ELEVATOR PRESSURIZATION FANS & DUCT OK
06/24/2011 MECHANICAL - INTERMEDIATE Partial Approval
06/15/2011 MECHANICAL - INTERMEDIATE Partial Approval
05/13/2011 MECHANICAL - INTERMEDIATE Partial Approval
05/11/2011 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/10/2011 MECHANICAL - INTERMEDIATE Partial Approval
05/04/2011 MECHANICAL - INTERMEDIATE Partial Approval LEVEL 6 BOOSTER FANS UNDER FLOOR OK EAST OF LINE D
04/29/2011 MECHANICAL - INTERMEDIATE Partial Approval
04/28/2011 MECHANICAL - INTERMEDIATE Partial Approval BOOSTER UNITS LEVEL 5 WEST OF LINE D INSTALLED OK UNDER FLOOR
04/07/2011 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
03/25/2011 MECHANICAL - INTERMEDIATE Partial Approval FIRE DAMPERS FROM SHAFTS ON 5TH FLOOR OK. STILL NEED TO SEE FLANGE PROPERLY ATTACHED WHEN OUTER LAYER OF SHEET ROCK APPLIED.
03/23/2011 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
PARTIAL-
FOR ROUND FIRE DAMPERS FRAME AND SQUARE OPENING AND FINISH WITH THE SUPPLIED FLAT PLATE ON THE OUTSIDE OF WALL AND SCREW TO FRAMING.
03/15/2011 MECHANICAL - INTERMEDIATE Partial Approval DUCTS INSTALLED FROM SHAFT AT ELEVATOR WITHOUT REQUIRED FIRE DAMPERS. SPOKE TO GARRETT OF RYAN CORP ABOUT THIS ISSUE.
03/15/2011 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) WALKED JOB WITH J. MILITELLO TO FAMILIARIZE HIM WITH THE PROJECT
2) ADDRESSED GREASE DUCT CLEANOUTS AND MAKE UP AIR
03/10/2011 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) ON SITE MEETING WITH G.C. AND MECHANICAL CONTRACTORS
03/04/2011 MECHANICAL - INTERMEDIATE Partial Approval 2 LAYERS FIRE WRAP ON 4 FABRICATED SECTIONS OF DUCT OK
03/03/2011 MECHANICAL - INTERMEDIATE Partial Approval SUN MECHANINCAL NOT READY TO PROVIDE PRETEST ON GREASE DUCT. SECTIONS OF DUCT DELIVERED TO SITE OK AND PERMISSION GIVEN TO SUN TO WRAP AND INSTALL ENTIRE LENGTH IF THEY PROVIDE MANOMETER TEST RATHER THAN SMOKE TEST ON COMPLETED INSTALLATION.
02/28/2011 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*