Permit: T10CM01795

Parcel: 11717023D


Addresses:

88 E BROADWAY BL


Inspection Status: Approved

Inspection History: MECHANICAL - HYDRONIC PIPING

Permit Number - T10CM01795

Inspection Description - MECHANICAL - HYDRONIC PIPING

Inspection Status - Approved

Date Description Inspector Results Comments
10/17/2011 MECHANICAL - HYDRONIC PIPING Approved
08/17/2011 MECHANICAL - HYDRONIC PIPING Partial Approval rework of chiller pipes at central plant and on roof ok
chiller water ok
08/10/2011 MECHANICAL - HYDRONIC PIPING Partial Approval AH2.2 & AH3.2 CONNECTION TO CHILLED WATER (110 PSI TEST) OK

HYDRONIC PIPING IN MECH 3 OK (110psi TEST)
08/03/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) HYDRO TEST TO LIEBERT UNITS IN U.P.S. ROOM PRESSURE TEST AT 100 PSI OK-OK TO INSULATE
07/29/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
07/25/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) HYDRO TEST ON WEST SIDE 1ST FLOOR TO ROOF OK ON 100 PSI PLUS-OK TO INSULATE
06/03/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
06/02/2011 MECHANICAL - HYDRONIC PIPING Partial Approval 1) HYDRO TEST ON AHU'S FROM 9 DOWN TO 4 AND INTO MECH ROOM OK AT 100 PSI EAST END
06/01/2011 MECHANICAL - HYDRONIC PIPING Partial Approval
05/11/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) OK TO PROCEED ON 9TH FLOOR
04/01/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) OK TO CONTINUE HYDRO INSULATION
03/31/2011 MECHANICAL - HYDRONIC PIPING Partial Approval 7 EACH DIFFERENT SIZE RUNS FROM LEVEL 9 IN EAST SHAFT DOWN TO 3RD FLOOR AN OVER TO LINE 11. TESTED AT 180 PSI.
03/29/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 6TH FLOOR CORE DUCT OK TO COVER
2) 5TH FLOOR CORE DUCT OK TO COVER
3) CWSR (WATER COOLED) FROM CENTRAL PLANT TO 9TH FLOOR OK
03/15/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*