Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - HYDRONIC PIPING
Permit Number - T10CM01795
Inspection Description - MECHANICAL - HYDRONIC PIPING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2011 | MECHANICAL - HYDRONIC PIPING | Approved | ||
08/17/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | rework of chiller pipes at central plant and on roof ok chiller water ok |
|
08/10/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | AH2.2 & AH3.2 CONNECTION TO CHILLED WATER (110 PSI TEST) OK HYDRONIC PIPING IN MECH 3 OK (110psi TEST) |
|
08/03/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1) HYDRO TEST TO LIEBERT UNITS IN U.P.S. ROOM PRESSURE TEST AT 100 PSI OK-OK TO INSULATE |
|
07/29/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* | |
07/25/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1) HYDRO TEST ON WEST SIDE 1ST FLOOR TO ROOF OK ON 100 PSI PLUS-OK TO INSULATE |
|
06/03/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* | |
06/02/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | 1) HYDRO TEST ON AHU'S FROM 9 DOWN TO 4 AND INTO MECH ROOM OK AT 100 PSI EAST END | |
06/01/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | ||
05/11/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1) OK TO PROCEED ON 9TH FLOOR |
|
04/01/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1) OK TO CONTINUE HYDRO INSULATION |
|
03/31/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | 7 EACH DIFFERENT SIZE RUNS FROM LEVEL 9 IN EAST SHAFT DOWN TO 3RD FLOOR AN OVER TO LINE 11. TESTED AT 180 PSI. | |
03/29/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1) 6TH FLOOR CORE DUCT OK TO COVER 2) 5TH FLOOR CORE DUCT OK TO COVER 3) CWSR (WATER COOLED) FROM CENTRAL PLANT TO 9TH FLOOR OK |
|
03/15/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* |