Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
Permit Number - T10CM01795
Inspection Description - PLUMBING - PROGRESS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2011 | PLUMBING - PROGRESS | Approved | SEE BUILD-OUT ACTIVITY T10CM03478 FOR FINAL INSPECTION INFORMATION | |
10/24/2011 | PLUMBING - PROGRESS | Partial Approval | ||
09/30/2011 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) COURTESY INSPECTION REQUESTED BY LEERAY 2) I NEED TO SEE THE CITY APPROVED PLAN REVISION REQUESTED ON 5/23/11 3) STACK FOUR AND STACK ONE, VENT TO WASTE PIPE CONNECTIONS ARE NOT INSTALLED PER PLAN 4) STACKS 7 & 8 VENT TO DRAIN CONNECTIONS ABOVE CEILING ON LEVEL #1 HAVE NOT BEEN INSPECTED 5) YOUR ENGINEER SHALL DRAW THESE CONNECTIONS AS INSTALLED AND SUBMIT DRAWINGS FOR PLAN REVIEW |
|
09/09/2011 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* COURTESY INSPECTION: TALKED WITH STEVE AND GARRET ABOUT ADDRESSING NAY UN-RESOLVED ISSUES AND PREPARING FOR AND REQUESTING INSPECTIONS FOR ANY AREAS THAT HAVE NOT BEEN INSPECTED OR APPROVED |
|
05/13/2011 | PLUMBING - PROGRESS | Partial Approval | ||
04/19/2011 | PLUMBING - PROGRESS | Partial Approval | RECEIVED LETTER DATED 4/14/11 FROM ROBERT KUNKEL, PE., ALLOWING AN AIR TEST ON COPPER WATER PIPING WHEN USING WATER IS NOT FEASIBLE. | |
04/11/2011 | PLUMBING - PROGRESS | Partial Approval | CISTERN AT NW CORNER ASSEMBLED OK. NEED TO SEE POND LINER PROPERLY TAPED AT TOP. | |
03/28/2011 | PLUMBING - PROGRESS | Not ready for Inspection | PLEASE READ AND PROVIDE PREVIOUSLY REQUESTED DOCUMENTATION AND CORRECTIONS OVER HEAD L 5 BR SINK DWV RETEST OK |
|
03/24/2011 | PLUMBING - PROGRESS | Not ready for Inspection | 1. NEW PLAN DIAGRAM P402 REQUIRES CITY PLAN REVIEW PRIOR TO ANY APPROVALS. 905.3 REQUIRES THAT A DRY VENT CONNECTS TO A SOIL OR WASTE PIPE ABOVE THE CENTER LINE. CLEANOUTS REQUIRED PER 708.3.4 AND SHOWN ON PLAN, HAVE NOT BEEN INSTALLED. VENT SHOWN FROM FIRST LEVEL VERTICAL OFFSET HAS NOT BEEN INSTALLED. PROVIDE A LETTER FOR AIR ONLY TESTING OF WATER PIPING. STACK TWO IS NOW STACK ONE PER PSK005. MEETING WITH GARRET ROBERT KUNKLE. MR KUNKLE AGREED TO OVERSEE THE RESTRAINTS SPECIFIED. | |
03/22/2011 | PLUMBING - PROGRESS | Not ready for Inspection | PLEASE SUBMIT A STAMPED LETTER TO RWS WITH THE SPECIFIC CHANGES TO PLAN SPECS FOR TESTING DWV, RWLS AND DOMESTIC WATER PIPING. INSTALL IPC APPROVED FITTINGS FOR CHANGES OF DIRECTION AS SPECIFIED IN SECTION 706.1 |
|
03/07/2011 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
03/03/2011 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) NOTHING READY PER ROB SELLERS #272-4820 |
|
02/24/2011 | PLUMBING - PROGRESS | Denied | 1. DOMESTIC WATER PIPING IS IN VIOLATION OF IPC SECTION 605.14.3. CORRECT ALL JOINTS THAT HAVE NOT BEEN REAMED. 2. NO PIPING SHALL BE CONCEALED WITH PAINT PRIOR TO INSPECTION. 3. CORRECT PIPE SIZING 4. DWV TEST NOT HOLDING. 312.3 5. EXTEND CLEANOUTS FOR ACCESS. 708.9 6. AIR TESTING FOR BOTH DWV AND DOMESTIC WATER IS OK PER KC MECH. ROBERT KUNKEL. |
|
02/22/2011 | PLUMBING - PROGRESS | Not ready for Inspection | I NEED TO INSPECT PER APPROVED PLANS. PROVIDE PROPER TEST GUAGES FOR FIVE POUND TEST ON DWV SYSTEMS. PROVIDE A METHOD TO TEST ALL JOINTS WHEN TESTING IN SECTIONS. PROVIDE PROPER ALIGNMENTOF FITTINGS. SWEEPS REQUIRED ON VERTICAL TO HORIZONTAL CHANGES OF DIRECTION. 120 PSI AIR ON DOMESTIC WATER PIPING IN WALLS ON LEVEL TWO. PSI DOWN AT MOP SINK. PROVIDE JOB SPEC. BOOK |
|
09/29/2010 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* REPAIR LEAK ON INLET SIDE OF GREASE INTERCEPTOR |