Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T10CM01795

Parcel: 11717023D


Addresses:

88 E BROADWAY BL


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T10CM01795

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
11/01/2011 PLUMBING - INTERMEDIATE Approved SEE BUILD-OUT ACTIVITY T10CM03478 FOR FINAL INSPECTION INFORMATION
10/24/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 2" CU RWC SUPPLY AND RETURN LINES, 1 1/2" CU IRRIGATION SUPPLY AND PUMP MANIFOLD-INSTALLED PER UNAPPROVED PLAN DATED 6/30/10
2) CORRECT DRIP ON UNION
3) PROVIDE BLACK AND YELLOW "NON POTABLE" LABELS ON ALL NON POTABLE COPPER PIPING
10/19/2011 PLUMBING - INTERMEDIATE Partial Approval
10/17/2011 PLUMBING - INTERMEDIATE Partial Approval INTERMEDIATES FOR BREAK ROOMS AND MOP ROOMS LEVELS 3-9 OK
08/18/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) HBS IN WALLS AT WEST LOBBY AND EAST EXIT PASSAGE WITH TEST OK TO COVER
07/22/2011 PLUMBING - INTERMEDIATE Partial Approval LVLS 4 - 8 1/2" RO & CW FROM EAST MECH TO BREAK ROOM
06/03/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
DOMESTIC WATER:
1) 1ST LEVEL TRS IN WALLS AND OVER HEAD AND SIZING CORRECTION FOR 2ND LEVEL TRS WITH 120 PSI HYDROSTATIC TEST OK
2) PROVIDE INSULATION, REMOVE DROPS TO DELETED P-8 FIXTURE
3) RED LINE CHANGE OF SOV ORIENTATION
06/02/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) 100 PSI AIR TEST ON 1ST L TR, PROVIDE HYDROSTATIC TEST IF POSSIBLE
2) RED LINE CHANGE OF SOV LOCATION AND CONNECTION FOR LAV WALLS
3) GET ENGINEER APPROVAL
05/24/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) P-8 LEVEL 2, STACK #5 DWV WITH TEST OK
2) INSTALL MS FAUCET BACKING
3) L-2 WATER PIPE SIZE CORRECTION HAS NOT BEEN INSPECTED OR TEST
05/23/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) STACK #3 VENT TO WASTE CONN INSTALLED PER PLAN WITH TEST OK
2) STACKS #4 AND 6; CORRECTIONS HAVE BEEN MADE AND TESTED
3) INSTALLATION APPEARS TO MEET CODE, BUT IS NOT EXACTLY PER PLAN. PLEASE CHANGE THE PLAN TO MATCH AND SUBMIT FOR PLAN REVIEW
4) NOTE: 4" WALL CO HAS NOT BEEN INSTALLED, ALSO ALL OVER HEAD CLEANOUTS REQUIRE ADAPTORS WITH PLUGS FOR ACCESS TO SERVICE
05/18/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 1ST LEVEL TOILET ROOMS, DWV TEST OK
2) STACK 8 OFFSETS, LEVEL 5 & 6 OK
3) STACK 7 DOMESTIC WATER INSTALLED WITH STACK 8 DWV-TEST TO L8. R OK WATER (T1) TO 7
05/11/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) CORRECTIONS NOTED ON 2.24, 3.17, 3.23 AND 3.24 HAVE NOT BEEN MADE
2) NOTE: ALL STACK VENT TO WASTE CONNECTIONS ARE WRONG AND NOT INSTALLED PER PLAN
05/10/2011 PLUMBING - INTERMEDIATE Partial Approval
05/10/2011 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) 1ST LEVEL TOILET ROOM URINAL REQUIRED PROPER USE OF FITTINGS
2) OVER HEAD CORRECTIONS HAVE NOT BEEN MADE AS SHOWN ON AS1 #16 CLEANOUT ON LEVEL 2 REQUIRE WITH RETEST TO 10' HEAD
04/22/2011 PLUMBING - INTERMEDIATE Partial Approval 9TH FLOOR RESTROOM CORE OK. 5 PSI AIR TEST ON WC'S WATER TEST THROUGH ROOF ON LAVATORIES.
04/21/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/20/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) L8 MS COVERED PRIOR TO INSPECTION
2) L9 MS PIPING TEST OK-INSULATE
3) WHO INSPECTED THE WATER PROOFING OF FLOOR DRAINS ON L4 ?
04/19/2011 PLUMBING - INTERMEDIATE Partial Approval HIGH PSI DOMESTIC RISERS IN MAIN PLUMBING CHASE; TEST OK.
04/18/2011 PLUMBING - INTERMEDIATE Not ready for Inspection NOTHING READY PER ROB
04/14/2011 PLUMBING - INTERMEDIATE Partial Approval L 3 SHOWER DIVERTERS OK
I NEED TO SEE SHOWER PAN LINER CONNECTION TO DRAIN ASSEMBLY.

L 3-4 LOW PSI WATER RISERS W/ 120 PSI AIR ONLY.

I STILL HAVE NOT SEEN APPROVAL ( FROM kUNKEL ) FOR AIR TESTING OF DOMESTIC WATER PIPING.
04/11/2011 PLUMBING - INTERMEDIATE Partial Approval HIGH & LOW PRESSURE DOMESTIC WATER RISERS FROM ABOVE CIELING ON 1 TO ABOVE CIEL ON 7 OK (RISERS ONLY)

5TH FLOOR OVERHEAD IN RESTROOMS OK

HOT WATER RETURNS 1-7 OK.
04/07/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
04/06/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
04/05/2011 PLUMBING - INTERMEDIATE Partial Approval WP AND DWV NOW OK FOR:
TI BATHROOMS AND EAST BREAKROOM LEVELS 5,6,7,8
EAST FLOOR DRAIN LEVEL 5
JANITOR CLOSET LEVELS 5,6,7
03/31/2011 PLUMBING - INTERMEDIATE Partial Approval WATER PIPING FOR TI BATHROOM AND BREAKROOM LEVEL 6 OK.
03/30/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
03/30/2011 PLUMBING - INTERMEDIATE Partial Approval LEVEL 6 DWV FOR TI BATHROOM & BREAKROOM SINK OFF STACK 4 TESTED 25 MINUTES AT 5 PSI

LEVEL 5 FLOOR SINK AND TRAP PRIMER LINE EAST SHAFT- AIR TEST OK
03/29/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) STACK 5, LEVELS 6 & 7 DWV AND WATER INSTALLED PER AS1-15 OK SUBJECT TO APPROVED PLANS REVISIONS
2) PROVIDE SAFETY PLATERS, BACKING AND PIPE INSULATION
03/28/2011 PLUMBING - INTERMEDIATE Partial Approval 5TH FLOOR OK TO COVER.
AIR TEST 5TH FLOOR ONLY -- DWV @ WEST BREAKROOM; JANITOR CLOSET DWV & WP; TI RESTROOM DWV & WP; DRAIN STACK EAST OF RESTROOMS;
EAST STACK FOR FLOOR DRAINS TESTED LEVEL 2 THRU 9.
03/25/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 120 PSI AIR ONLY TEST ON LEVEL 6
2) TR 607 LAVATORY WALL, LEVEL 7 TRMS 706 & 707 AND LEVEL 8 TRMS 806 AND 807 DOMESTIC WATER
3) OK TO INSULATE
4) TRAP PRIMERS AND SOVS NOT YET INSTALLED
5) DWV TEST ON LEVEL 8 TRMS 806 & 807 OK
03/23/2011 PLUMBING - INTERMEDIATE Partial Approval 1. AIR TEST HOLDING ON STACK #2, HOWEVER, THE VENT STACK CONNECTIONO WASTE IS NOT INSTALLED PER PLAN. INSTALL PER PLAN WITH CLEANOUTS AS SHOWN, AND CONNECTION TO VERTICAL STACK. RETEST. DWV TOILET ROOM LEVEL SEVEN TEST OK.
03/22/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
03/21/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
03/17/2011 PLUMBING - INTERMEDIATE Denied stack 4; 4" vent stack connection to 6" soil stack is not per plan, also the cleanout shown on your plan is missing.
4" soil piping from level 2 shall connect at 24" below horizontal offset per your plans.
Provide restraints as specified.
Provide the detailspecified in plumbing note 11.

Provide engineer oversight of restraint requirements.
03/17/2011 PLUMBING - INTERMEDIATE Partial Approval level 2 in walls, dwv test ok. will retest below floor corrections to 2nd level test wyes.
03/16/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 2ND LEVEL LAV WALLS AND BELOW FLOOR SOIL PIPING WITH TEST OK
2) 1ST LEVEL OVER HEAD VENTS FROM WATER PUMP AND ALONG COL 7 WITH FUTURE CONNECTIONS
03/15/2011 PLUMBING - INTERMEDIATE Partial Approval 1. DWV TEST ON LEVEL THREE TRS OK.
03/11/2011 PLUMBING - INTERMEDIATE Partial Approval LEVELS 4 & 5 LAV WALLS AT BATHROOM CORE OK.
LEVEL 4 CENTRAL PLUMBING WALLS FOR BATROOM CORE OK.
03/11/2011 PLUMBING - INTERMEDIATE Partial Approval LEVEL 5 BATHROOM CORE OK ON PM INSPECTION
03/10/2011 PLUMBING - INTERMEDIATE Cancelled
03/10/2011 PLUMBING - INTERMEDIATE Partial Approval TESTS FAILED LEVEL 4 & 5 EXCEPT FOR SOUTH LAV WALL
03/09/2011 PLUMBING - INTERMEDIATE Not ready for Inspection WHEN TESTING IN SECTIONS, THE UPPER MOST 10' OF THE PREVIOUSLY TESTED SECTION SHALL BE RETESTED SO THAT NO FITTING IS TESTED WITH LESS THAN 10' OF HEAD PRESSURE.
03/07/2011 PLUMBING - INTERMEDIATE Partial Approval WATER IN WALL ONLY GANG RESTROOM 4TH LEVEL AND LAV WALL SOUTH RESTROOM 5TH LEVEL.
03/07/2011 PLUMBING - INTERMEDIATE Denied 1. AIR TEST LEVEL FOUR DENIED. ALL THREE TESTS ARE BELOW FIVE PSI. SHUT OFF VALVES SHOWN FOR HAMMER ARRESTORS. SIZING CORRECTIONS HAVE NOT BEEN MADE. RED LINE PLANS IF MAKING CHANGES. CONTINUED DENIED INSPECTIONS MAY RESULT IN A REINSPECTION FEE.
03/04/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
03/03/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
03/02/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
03/01/2011 PLUMBING - INTERMEDIATE Not ready for Inspection PLUMBER NOT READY, COURTESY WALK THROUGH WITH ROB SELLERS 1. STILL NEED SIZING CORRECTIONS.

NOTE: DWV FITTINGS REQUIRED ON TRAP ARMS.
02/28/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
02/28/2011 PLUMBING - INTERMEDIATE Partial Approval BATHROOMS LEVEL 2 & 3 OK TO COVER
02/24/2011 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) DOMESTIC WATER TUBING IS IN VIOLATION OF IPC SEC 605.14.3, CORRECT ALL JOINTS THAT HAVE NOT BEEN REAMED. NO PIPING SHALL BE CONCEALLED WITH PAINT PRIOR TO INSPECTION
2) CORRECT PIPE SIZING
3) DWV TEST NOT HOLDING 312.3
4) EXTEND CLEANOUTS FOR ACCESS 708.9
5) AIR TESTING FOR BOTH DWV AND DOMESTIC WATER IS OK PER K C MECH-ROBERT KUNKEL
02/23/2011 PLUMBING - INTERMEDIATE Not ready for Inspection TEST ON PIPE LEVEL 2 WAS REMOVED BEFORE INSPECTION. NEED STAMPED AFI ALLOWING AIR-TEST ON DWV
02/22/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*