Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - PROGRESS
Permit Number - T10CM01795
Inspection Description - ELECTRIC - PROGRESS
Inspection Status - Partial Approval
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/01/2011 | ELECTRIC - PROGRESS | Approved | SEE BUILD-OUT ACTIVITY T10CM03478 FOR FINAL INSPECTION INFORMATION | |
| 10/28/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 10/27/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK PR, DPR AND ROOM R04 2) PROPERLY SUPPORT CONDUIT ON WALL |
|
| 10/26/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) FINISH LIGHTING ROOF GARAGE 2) BOXES ON BLDG PATIO 4TH FLOOR 314.20 |
|
| 10/25/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) DISCONNECTING MEANS FOR ? DOOR MOTORS IN CENTRAL PLANT |
|
| 10/24/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK LIGHTING ATS ROOM, MAIN ELECTRIC ROOM, GENERATOR ROOM, FIRE PUMP ROOM, WATER PUMP ROOM, ELECTRIC 1 EAST, STAIRWELL #3, 4 & 5. COMM ROOMS FLOORS 5-9 AND ELECTRIC ROOMS FLOORS 5-9 EAST AND WEST 2) NEED BARRIERS FOR DEVICES MORE THAN 300 V BETWEEN 404.8 |
|
| 10/21/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK BRANCH CIRCUITS HL8E, H8E, UPS8E, HL8W, H8W, UPS8W, SB8W AND SB7W 2) OK MAIN PB2 AND TRANSFORMER TB2 3) OK EMERENCY TEST FOR ATS 700, 701 AND 702 A & B OK POWER FROM GENERATOR TO FIRE PUMP |
|
| 10/20/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK BRANCH DSCPA AND DSCPB 2) OK PARTIAL CPA, CP8-CHILLER PUMPS AND WATER PUMPS 3) PANEL CPB TIGHTEN LOCK NUT, CLEAN DIRT, KO SEAL 4) FINISH WATER HEATERS AND RAIN RECLAMATION |
|
| 10/19/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) FILL UNUSED OPENINGS 2) NEED APPROVED CONDUCTOR STRAIN RELIEF FOR RUN HSPR 300.19 3) BOND GUTTERS FOR H?PR PULL 4) LIGHTS IN 4 EAST ELECTRICAL ROOM NOT WORKING |
|
| 10/18/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK BRANCH CIRCUITS HL6E, UPS6E, HL6W, H6W, UPS6W, H7W, HL7W, UPS7W, H7E, HL7E, UPS7E, SB7E, PSBB3 AND TB-3 2) VERIFY LISTING OF SUMP PUMPS 3) LABEL ALL DISCONNECTS 4) CANNOT STACK LUGS 5) FINISH LIGHTING RELAYS 6) FINISH MOUNTING TRANSFORMERS 7) PANEL DIRECTORIES 408.4 |
|
| 10/17/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/14/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK LIGHT B-1, B-2 AND B-3 OPEN AREAS LEVEL 1 ON CEILING 2) FINISH LIGHTING FAN ROOMS AND STORAGE AREAS 3) BOXES MORE THAN 1/4" 314.20 |
|
| 10/13/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) GENERAL WALK THRU |
|
| 10/12/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK MSB, FIRE PUMP CONTROLLER, GENERATOR, GOPDB, LBDB, ATS 700, 701, AND 702A & B TO MAINS FIRE PUMP ROOM: 1) STRAP CONDUITS PER CODE 2) TIGHTEN LOOSE FITTINGS 3) PIGTAIL FOR GROUND TO BE #8 ATS'S AND GENERATOR: 1) PROTECT CONDUCTORS 352.46 &300.4 2) WILL NEED COPY OF GENERATOR TEST 3) WILL NEED LABELING 700.8, 701.9 AND 702.8 |
|
| 10/07/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/06/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) NEED ACCESS FOR WIRE WAY COOLER ELEC ELEVAVATER LOBBY B-1 2) NOTE: REFFERENCE NEC 625 FOR ELECTRIC VEHICLE & GARGIN SYSTEMS - PLEASE PROVIDE MANUFACTURE INSTRUCTIONS 3) FINISH VDV CABLEING B1,B2,B3 4)PROTECT CONDUCTER AT BOX B-3 |
|
| 10/04/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK PANELS H2E, H2EA, H2EB, H2W, H2WA, H2WB AND CP1 2) FINISH ARC FLASH LABELING |
|
| 10/03/2011 | ELECTRIC - PROGRESS | Partial Approval | ||
| 09/30/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/29/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/27/2011 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROTECT CONDUCTORS FROM SHARP METAL EDGES 2) MISSING DEVICE COVER PLATES 3) BOXES MORE THAN 1/4" 314.20 4) MISSING EXIT SIGNS ROOM 545 5) MISSING JUNCTION BOX COVERS AND KO'S 6) USED SEPERATION OF DEVICES OER 300V TO GROUND 404.8 |
|
| 09/26/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) NOTE: JOCKEY PUMP LABELED 115/208-230/110/220 |
|
| 09/23/2011 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 09/22/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/21/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK LIGHTS STAIRWELL #1 |
|
| 09/20/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK CIRCUITS TO PUMP VFD'S CENTRAL PLANT: 1) MISSING LB COVERS AND JUNCTION BOX COVERS FOR VFD'S 2) PROPERLY SUPPORT FLEX CONDUITS FOR LIGHTS 3) CHECK FITTINGS AND COUPLINGS FOR TIGHTENS |
|
| 09/19/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK CONDUITS ON NORTH RACK AT SERVICE DRIVE 2) OK LIGHTS (4') SERVICE DRIVE 3) NEED ILLUMINATION AT TRANSFER SWITCHES-ATS 700, 701, 702A AND 702B |
|
| 09/16/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/15/2011 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 09/12/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 3RD FLOOR: 1) OUTLET ON CORE WALL BEHIND NEW STUD FRAMED WALL |
|
| 09/09/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/08/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/06/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/25/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 08/24/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* OK P9WA, P9WB, S39W, UPS9W, P9EA, P9EB, SB9E, UPS9E, T9E, H9E, HL9E, PESA, PE8B, 1) NOTE ERATON OF CONDUCTOR 310.15 2) WHERE IS NEUTRAL FOR H9E 3) SWITCH BARRIERS 4) NEED ILLUMINATION 5TH FLOOR WEST ELECTRIC ROOM |
|
| 08/23/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* NOTE FIRE ALARM CABLE 300.19 TABLE A |
|
| 08/22/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/18/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK 7TH FLOOR-SEE TI SHEET |
|
| 08/17/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/16/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/15/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/11/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/10/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/09/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/08/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/05/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/04/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/02/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/01/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/27/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/26/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/25/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/22/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/21/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/20/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/19/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/18/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 07/14/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/13/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/12/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/11/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/08/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/07/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/06/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 07/01/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/30/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/29/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/28/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/27/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/24/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 06/23/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/22/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 06/21/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/16/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/15/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/14/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 06/13/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/08/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/07/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/06/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* OK WALLS 102,103,104,105,106,107, 202, 302, 402, ATRIUM WALL AT 2ND FLOOR FOR LIGHTS 1. MECHANICAL ROOM 108 COVERED WITHOUT INSPECTION 2. STRAP CONDUITS DOWN FROM CEILING AT VESTABULE FOR ELEVATORS FLOOR 1-9 |
|
| 06/04/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/03/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/02/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/01/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/31/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* OK STAIRWELL FIRE ALARM 7-8-9 & 3-4 1) SUPPORT FLEX CONDUITS FOR ELEVATOR CONTROLS *02 ROOMS ALL FLOORS 2) FINISH 202, 302, 402 |
|
| 05/27/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/25/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK DOMESTIC WATER PUMP AS CONTROLLER 2) OK TEMP POWER TO CWP-2, CWP-3 3) OK POWER FROM SES "A"-HGA-HIMPOP-PUMP CONTROLLER |
|
| 05/23/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/20/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/19/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 05/18/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/17/2011 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 05/16/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/13/2011 | ELECTRIC - PROGRESS | Partial Approval | ||
| 05/11/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/10/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/09/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/06/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 05/05/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/04/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 05/03/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 05/02/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/29/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/28/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/27/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/26/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/25/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/21/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/20/2011 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 04/19/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/18/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 04/14/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/13/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 04/12/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/11/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/08/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/07/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/06/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/05/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 04/04/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 04/01/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 03/31/2011 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/30/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 03/29/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 03/28/2011 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1) NO WORK PROGRESS FROM 3/25/11 INSPECTION |
|
| 03/25/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) FINISH 511,502,513,STAIRWELL AND PHYSICAL PROTECTION OF M/C |
|
| 03/24/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK WALLS #503, 508 AND 511 2) PROVIDE PHYSICAL PROTECTION FOR M/C CABLES AT BATHROOM WALLS |
|
| 03/23/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 02/08/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 02/08/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 02/02/2011 | ELECTRIC - PROGRESS | Partial Approval | ||
| 02/01/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 01/31/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 01/24/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 01/20/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* OK FIRE ALARM, SECURITY + CAMERA BOXES + ENT 1. FINISH LIGHTING POWER + EMERGENCY |
|
| 01/13/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 01/06/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK B-1 SOUTH AND OK 8TH DECK NORTHEAST |
|
| 12/29/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 12/17/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 12/17/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 12/13/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 12/07/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/30/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/29/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 11/23/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/19/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/17/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/10/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) NO WORK DONE AT THIS TIME |
|
| 11/05/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/04/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 11/04/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/03/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/02/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 10/30/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/29/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 10/26/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/15/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/13/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/12/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/05/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/02/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/01/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 09/30/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/27/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 09/27/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/21/2010 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 09/17/2010 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* |