Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/23/2011 |
ENGINEERING - FINAL |
|
Approved |
COMPLET ALL NOTES FOR T10BU01437 TO FINAL GRADING PERMIT. |
| 08/19/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
CLEAN UP THE SITE, AND REMOVE ALL EXCESS CONSTRUCTION MATERIALS FROM THE SITE. |
| 08/18/2011 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
PROVIDE ENGINEERS GRADING CERTS.COMPLET DUMSTER ENCLOURE.STABLIZE LOTS TO THE WEST AND SOUTH OF JOB SITE. |
| 08/02/2011 |
ENGINEERING - FINAL |
|
Continued |
1COMPLET GATES FOR DUMPSTER ENCLOURE.2COMPLET ALL DRAINAGE 3COMPLET ALL WATER HARVESTING AREA 4 COMPLET ALL LANDSCPAPEING 5 PROVID ENGINEERING CERTS FOR GRADING. |
| 08/01/2011 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
COMPLTE ALL WORK ON AP PLANS HAVE CERT FROM ARCHITECT FOR GRADING AND PAST LISTS. |
| 07/28/2011 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
1COMPLET ALL WORK. 2COMPLET ALL WATER HARVIESTING.3 COMPLET ALL LANDSCAPING 4 COMPLET ALL REPAIRS IN DRIVEWAY. 5 COMPLET ALL SIDE WALK AND ADA RAMPS. 6 LIST MAY NOT BE COMPLET. |
| 07/28/2011 |
ENGINEERING - FINAL |
|
Continued |
COMPLET LIST FROM 7-27 -2011 AND ALLWORK ON AP PLANS. |
| 07/15/2011 |
ENGINEERING - FINAL |
|
Continued |
PULLED MEASUREMENTS WITH CONCRETE CONTRACTOR NO MEASUREMENTS INDICITED ON PLANS FOR EAST SIDE DRIVE WAY AREA PROVIDE MEASUREMENTS FROM ENGINEER. |