Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PRE SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2010 | PLUMBING - PRE SLAB | Approved | IVRS - Inspection :* | |
| 07/19/2010 | PLUMBING - PRE SLAB | Not ready for Inspection | IVRS - Inspection :* | |
| 07/16/2010 | PLUMBING - PRE SLAB | Not ready for Inspection | IVRS - Inspection :* | |
| 07/13/2010 | PLUMBING - PRE SLAB | Partial Approval | IVRS - Inspection :* 1) MS CORRECTION OK 2) RED LINE PLANS PRIOR TO NEXT INSPECTION 3) KEEP ALL OPEN DRAIN AND VENT PIPING CAPPED DURING CONSTRUCTION FOR SAFETY |
|
| 07/12/2010 | PLUMBING - PRE SLAB | Not ready for Inspection | IVRS - Inspection :* 1) NOT PER PLAN, RED LINE CHANGES OF ROUTING 2) USE OF AIR ADMITTANCE VALVES WILL REQUIRE A PLAN REVISION 3) CORRECT MOP SINK DRAIN SIZE AT WET VENT 4) INSTALL TEST FITTINGS NEEDED FOR TESTING ABOVE SLAB 5) 4" CLEANOUT NEEDED AT TIE IN 6) TOILET ROOM NOT READY |