Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
Permit Number - T10CM01538
Inspection Description - MECHANICAL - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2011 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
11/24/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) LINE ITEMS 1, 2 AND 3 OK-RECALL FOR ITEMS#4-11 |
|
08/02/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ROOF STRUCTURE IS NOT STRONG ENOUGH TO SUPPORT THE WEIGHT OF THE NEW UNIT 2) CONTRACTOR ALSO CUT A 1" X 8" BRACE FROM 1 TRUSS 3) PROVIDE THE REQUIRED STRUCTUAL DRAWING FOR NEW UNIT ON ROOF. HAVE A STRUCTUAL ENGINEER REVIEW THE STRUCTURE 4) RELOCATE THE ELECTRICAL CONDUIT TO THE ROOF 5) REPAIR BIRD BLOCK BEHIND ELECTRIC MAST. 6) ID CIRCUIT BREAKER 7) TERMINATE CONDENSATE TO WITHIN 6" OF THE GROUND-SUPPORT EVERY 4' 8) PAINT WITH LATEX PAINT 9) PROVIDE A BUSHING IN THE ELECTRIC DISCONNECT 10) PROVIDE THE REQUIRED SERVICE RECEPT ON THE ROOF, MUST BE GFI 11) PROVIDE A PRESSURE TEST ON ALL NEW GAS PIPING |