Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2011 | MECHANICAL - FINAL | Approved | ||
| 01/19/2011 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) ALL ELECTRIC CONDUIT TO BE BLOCKED UP MINIMUM 1.5" USE EITHER PRESSURE TREATED OR RED WOOD 2) PROVIDE FLEX CONNECTORS AT UNIT 3) ALL CONDENSATE PIPE TO BE COPPER, HAVE CLEANOUTS AT ALL CHANGE OF DIRECTION AND BE INSULATED 4) DUCT NOT SIZED PER PLANS 5) DUCT HANGERS NOT PER PLANS |