Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/02/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL CORRECT T & P DRAINAGE 2) INSTALL 6" VENT PIPING TO TERMINATION AT CAP |
|
| 06/29/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE FULL SIZE T & P DISCHARGE AT ALL LOCATIONS DISCHARGE DOWN 2) SUPPORT WATER HEATER TO WALL AND SECURE PIPING TO HEATER 3) PROVIDE INSTA HOT INSTALLATION INSTRUCTION BOOKLET FOR VENT REQUIREMENTS AND TERMINATE 3' ABOVE TOP OF COOLER INTAKE 4) MAKE WEATHER PROOF PIPE AND CONDUIT THRU ROOF SURFACE |