Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2011 | MECHANICAL - INTERMEDIATE | Approved | ||
| 03/22/2011 | MECHANICAL - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 11/30/2010 | MECHANICAL - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 11/12/2010 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 2ND FLOOR FLEX DUCTS SMASHED AT CONNECTION TO DROP FROM ROOF AND AT DROP INTO CHASE 2) SEE ENGINEER FOR DIRECTION 3) A CERTIFIED AIR BALANCE REPORT MAY BE NEEDED |
|
| 11/09/2010 | MECHANICAL - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) SOME FLEX DUCT SMASHED AT DROP INTO CHASE 2) 1ST FLOOR COLLECTOR PLENIUMS REQUIRE INSULATION 3) LEAVE SHEETROCK OFF AT THESE AREAS |