Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 06/03/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PIPE INSULATION EXPOSED TO EXTERIOR IS TO BE COATED PER INSTALLATION INSTUCTIONS 2) ALL PVC PIPING TO HAVE PRIMERED JOINTS, PRIMER IS TO BE PURPLE IN COLOR PER UPC 3) ALL PVC EXPOSED TO EXTERIOR IS TO BE U.V. PROTECTED 4) PVC TO TERMINATE WITHIN 6" OF GRADE AND 90 DEGREE AWAY FROM STRUCTURE 5) PROVIDE MINIMUM 1" CLEARANCE TO COMBUSTIBLES ON B-VENT 6) SINGLE WALL PIPING NOT ALLOWED IN ATTIC SPACE AND B VENT ONLY |