Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - PROGRESS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2010 | BUILDING - PROGRESS | Approved | IVRS - Inspection :* 1) OK TO DRY WALL 2) NEED A GROUND SYSTEM 3) ROOF JACKS FOR 3/4 DIAMETER CONDUIT AND 2" VTR |
|
| 05/20/2010 | BUILDING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) NEED EXHAUST FAN BATHROOM 2) 125 AMP SERV. 1/0 AL 3) NEED 20 AMP CIRCUIT GFCI TO BATHROOM LAV 4) DUCT SIZES, CHECK FOR INSULATED DUCTS ON ROOF 5) 1 RECEPT REQUIRED AT BATHROOM DOOR 6) NEED PLUMBING SCOPED FOR FITTINGS SLOPE, CHECK FOR TOILET VENT 7) TWO 3/4" DIAMETER H20 LINES |