Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/07/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CANNOT USE PLASTIC BOXES WITH METAL RACEWAYS NEC 314.3 2) GROUNDING ELECTRODE CONDUCTOR TO BE CONTINOUS, NOTE 12 SHEET 1 3) GROUND PV PANELS PER INSTRUCTIONS AND PROVIDE PLANS 4) PROVIDE INSTRUCTIONS FOR INSTALL OF KVAR UNIT, IT'S DBL TAPED WITH DRYER BREAKER 5) STRAP SEAL TIGHT PER NEC 350 |
|
| 07/02/2010 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED |
|
| 06/24/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL BREAKERS LISTED FOR USE IN GE SERVICE PANEL 2) PLAN CALLS FOR 40 AMP BREAKER AT SERVICE PANEL 3) INSTALLATION TO COMPLY WITH PLANS, NEED TO READ ALL NOTES AND INSTALL PROPER LABELING PER PLANS & NEC 690 4) GROUNDING ELECTRODE TO BE CONTINOUS TO INVERTER 5) CANNOT USE WHITE CONDUCTOR AS GROUND 6) BOND AROUND REDUCING WASHERS OR INSTALL PER INSTUCTIONS 7) STRAP EMT TO WITHIN 3' OF CONNECTIONS 8) OPEN CONDUCTORS THRU ATTIC IS NOT A RECOGNIZABLE WIRING METHOD PER NEC 9) ALL ROOF PENETRATIONS REQUIRE PROPER FLASHING 10) SIZE JUNCTION BOXES PROPERLY NEC 314.16 11) USE WEATHER PROOF CONNECTORS AT JUNCTION BOX ENTRIES 12) SEAL ALL OPENINGS ON JUNCTION BOXES 13) GROUND MODULES PER INSTRUCTIONS PROVIDED WITH GROUNDING SYSTEM BEING USED. PROVIDE COPY OF INSTRUCTIONS FOR INSPECTOR 14) TIGHTEN ALL FITTINGS 15) SYSTEM NOT TO BE ENERGIZED UNTIL ELECTRIC INSPECTION APPROVED |