Permit: T10CM01302

Parcel: 12810082B

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T10CM01302

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
04/06/2011 PLUMBING - FINAL Approved IVRS - Inspection :*
02/02/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*WAITING ON COMPLETION OF GAS TO FIRE PIT.
01/20/2011 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
1) SEE NOTES #1, 4 & 5 FROM 1/19/11 INSPECTION HISTORY AND NOTES FROM 03052 INSPECTION DATED 1/19/11. RECEIVED LETTER TO DELETE SOFTNER FOR WATER SYSTEM
01/19/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) PROVIDE SEPERATE DRAINS FOR ICE STORAGE & FOUNTAIN DRAIN PROPERLY PRIMED AND GLUED
2) PAINT VENTS ON ROOF
3) MAKE ALL FIXTURES WATER TIGHT
4) MAKE THE TRAP ARM CORRECT AT HAND SINK FOR FOUNTAIN STATION CORRECT
5) PROVIDE TEMPERING FOR PUBLIC USE LAVS
6) PROVIDE APPROVAL FOR SOFTNER DELETION
01/18/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) CANCELLED BY TONY
01/14/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) CALL IN ALL INSPECTIONS FOR PLUMBING THAT HAVE NOT BEEN APPROVED
2) PROVIDE SEPERATE DRAINAGE FOR ALL INDIRECT DRAINS PROPERLY INSTALLED
3) PAINT VENT THRU ROOF TO PROTECT ABS FROM SUN EXPOSURE
4) WATER TO COOLER TO BE MADE WEATHER TIGHT AT ROOF JACK AND BE PROTECTED FROM FREEZING
5) ALL FIXTURES TO BE MADE WATER TIGHT AT WALLS AND FLOORS
6) ALL GAS APPLIANCES ON WHEELS TO HAVE SAFETY CABLES INSTALLED
7) PROVIDE BACKFLOW CERTS, STERILIZATION AND BACTERIA REPORTS
8) WASHING MACHINE WATER SUPPLIES TO HAVE HAMMER ARRESTORS
9) PROVIDE SEPERATE DRAINS FOR ICE STORAGE, CONDENSATE ICE MACHINE AND FILTER DRAIN
10) PROVIDE LISTING OF BACKFLOW PROTECTION FOR WATER TO ICE MACHINE FOR WATER
11) TERMINATE ICE STORAGE BIN AT FOUNTAIN STATION WITH APPROVED DRAINAGE PIPING AND 1" AIR GAP AT FLOOR SINK
12) COMPLETE INSTALL OF ALL PLUMBING SUPPLIED EQUIPMENT
13) TERMINATE DRASIN AT HAND SINK AT FOUNTAIN DISPENSING STATION CORRECTLY
14) VERIFY CORRECT BACKFLOW PROTECTION TO ALL CARBONATORS AND WATER SUPPLY TO NON-CARBONATED DISPENSERS.
15) LIST IS NOT COMPLETE
01/13/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED