Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T10CM01302
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/06/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
02/02/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*WAITING ON COMPLETION OF GAS TO FIRE PIT. | |
01/20/2011 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) SEE NOTES #1, 4 & 5 FROM 1/19/11 INSPECTION HISTORY AND NOTES FROM 03052 INSPECTION DATED 1/19/11. RECEIVED LETTER TO DELETE SOFTNER FOR WATER SYSTEM |
|
01/19/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE SEPERATE DRAINS FOR ICE STORAGE & FOUNTAIN DRAIN PROPERLY PRIMED AND GLUED 2) PAINT VENTS ON ROOF 3) MAKE ALL FIXTURES WATER TIGHT 4) MAKE THE TRAP ARM CORRECT AT HAND SINK FOR FOUNTAIN STATION CORRECT 5) PROVIDE TEMPERING FOR PUBLIC USE LAVS 6) PROVIDE APPROVAL FOR SOFTNER DELETION |
|
01/18/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED BY TONY |
|
01/14/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CALL IN ALL INSPECTIONS FOR PLUMBING THAT HAVE NOT BEEN APPROVED 2) PROVIDE SEPERATE DRAINAGE FOR ALL INDIRECT DRAINS PROPERLY INSTALLED 3) PAINT VENT THRU ROOF TO PROTECT ABS FROM SUN EXPOSURE 4) WATER TO COOLER TO BE MADE WEATHER TIGHT AT ROOF JACK AND BE PROTECTED FROM FREEZING 5) ALL FIXTURES TO BE MADE WATER TIGHT AT WALLS AND FLOORS 6) ALL GAS APPLIANCES ON WHEELS TO HAVE SAFETY CABLES INSTALLED 7) PROVIDE BACKFLOW CERTS, STERILIZATION AND BACTERIA REPORTS 8) WASHING MACHINE WATER SUPPLIES TO HAVE HAMMER ARRESTORS 9) PROVIDE SEPERATE DRAINS FOR ICE STORAGE, CONDENSATE ICE MACHINE AND FILTER DRAIN 10) PROVIDE LISTING OF BACKFLOW PROTECTION FOR WATER TO ICE MACHINE FOR WATER 11) TERMINATE ICE STORAGE BIN AT FOUNTAIN STATION WITH APPROVED DRAINAGE PIPING AND 1" AIR GAP AT FLOOR SINK 12) COMPLETE INSTALL OF ALL PLUMBING SUPPLIED EQUIPMENT 13) TERMINATE DRASIN AT HAND SINK AT FOUNTAIN DISPENSING STATION CORRECTLY 14) VERIFY CORRECT BACKFLOW PROTECTION TO ALL CARBONATORS AND WATER SUPPLY TO NON-CARBONATED DISPENSERS. 15) LIST IS NOT COMPLETE |
|
01/13/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED |